# Who pays when the route changes
- URL: https://www.optivis.com.sg/insights/who-pays-when-the-route-changes/
- Published: 2026-11-16T00:30:00.000Z
- Updated: 2026-11-16T00:30:00.000Z
- Description: Suez is half back, the Gulf is still being shot at, and Asian ports are more congested than during the pandemic. None of that is in your freight contract. Which means the next time a carrier reroutes, somebody is going to pay for it, and the contract probably does not say who.
- Author: Aaron Michael
- Tags: APAC & Cross-Border, #region-both

In October, carriers put 467,297 TEU of weekly capacity back through the Red Sea. [Xeneta puts that](https://theloadstar.com/calmer-waters-for-container-spot-rates-but-fragile-middle-east-a-threat/?ref=optivis.com.sg) at half the pre-crisis level and roughly double what was on offer at the end of August. [Dimerco counts 63 percent](https://dimerco.com/news-press/asia-pac-freight-report-november-2026/?ref=optivis.com.sg) of Far East to Europe capacity back on the Suez routing. Spot rates have been sliding for twelve weeks.

In the week to 4 November, [UKMTO logged eleven attacks](https://www.argusmedia.com/en/news-and-insights/latest-market-news/2901533-iran-increases-hormuz-attacks-commercial-threats?ref=optivis.com.sg) on ships in the Gulf. Xeneta's chief analyst said the Red Sea recovery "should not distract from the fragility" of the wider region and that it would not take much for the house of cards to come down. [Global port congestion passed 3.5 million TEU](https://www.sekologistics.com/hk-en/resource-hub/news/global-port-congestion-surpasses-pandemic-highs-what-shippers-need-to-know/?ref=optivis.com.sg) on 1 November, more than at any point during the pandemic.

The route back through Suez is open, it is cheaper, and it can close again on a Tuesday. A carrier that reroutes mid-voyage adds two weeks and a surcharge. Who absorbs that is the question nobody has written down.

## The contract is silent, which means the carrier decides

Most freight agreements we see have a rate, a routing assumption that was never stated out loud, and a force majeure clause written by someone who was thinking about typhoons. They do not say what happens when the carrier changes the route for its own reasons, or when the booked sailing is blanked, or when a transshipment port is too congested to make the connection.

When the contract is silent, the carrier's bill of lading terms fill the gap. Those terms say the carrier can take any route it likes, and that you pay whatever it costs. The forwarder, if there is one, passes that through with a handling fee. By the time your finance team sees it, the money has been spent and the argument is about reimbursement, not permission.

We wrote last month about [reading the fuel clause before you sign](https://www.optivis.com.sg/insights/before-you-sign-the-freight-rate/). This is the clause next to it, and it matters more right now.

## Four situations, four different answers

A route change is not one thing. Each of these has a different cost, a different decision point, and should have a different answer in the contract.

The carrier reroutes a sailing after departure. Cape instead of Suez because something happened in the Red Sea. Transit time goes up two weeks. The carrier will add an emergency surcharge and it will be on the invoice before you have been told. What you can negotiate: notice, a cap on the surcharge, and the right to see the carrier's own notice rather than the forwarder's summary of it.

The booked sailing is blanked. Your container was confirmed on a vessel that is no longer sailing. The next one is a week later and may be full. What you can negotiate: whether a confirmed booking carries any obligation at all, and what the carrier owes you if it does not. In most agreements the honest answer is nothing, and it is better to know that than to assume otherwise.

Transshipment fails. The box reaches Singapore or Port Klang on time and misses the connection because the connecting vessel is queuing. [SEKO's current update](https://www.sekologistics.com/hk-en/resources/asia-supply-chain-weather-center-live-port-freight-updates/?ref=optivis.com.sg) has Port Klang and Cai Mep both under pressure and Ningbo waiting three to four days. The delay is real, but nobody changed a route, so no surcharge is triggered. Instead you get storage at the hub and a later ETA. What you can negotiate: who pays the hub storage when the connection is missed for the carrier's reasons rather than yours.

You ask for a different route. Air instead of ocean, or a different gateway, because the customer cannot wait. This is the one that is clearly your cost, and the one where the contract should say who in your company is allowed to authorise it and how fast.

## The question to put to your forwarder this week

Ask them, in writing: on my current contract, if the carrier reroutes via the Cape next month, what will I be charged, when will I be told, and what can I refuse?

A good forwarder answers in a day and the answer is specific. A forwarder who sends you back the carrier's tariff page has told you something as well, just not what you asked.

Then do the same for a blanked sailing and a missed transshipment. Three questions, three written answers. Put them next to the contract and see whether they agree with it.

## What to write into the next agreement

Contracts are being renegotiated now for 2027, with Asia-Europe rates under pressure and carriers trying to lock in volume before the Suez return takes rates lower. That is the moment to add the routing clause, while you have leverage.

What it should cover: the routing the rate assumes. What constitutes a route change. Notice period before a surcharge applies. A cap, or at least a formula, for emergency surcharges. Whether blank sailings carry any remedy. Who pays hub storage on a missed connection. Who on your side can approve an alternative, and the spend limit.

None of that makes the Red Sea safer or the ports emptier. It makes the invoice predictable, which is the only part of this you actually control.

---